1. 作業時程:113年6月10日至114年12月31日期間,實際施工時程仍需視氣象因素與作業狀況而定。
2. 作業船位置(坐標系統:WGS84):
(1) 作業風場範圍:
W1:120°11'17.1"E,24°07'15.3"N
W2:120°14'56.7"E,24°06'40.4"N
W3:120°12'22.1"E,24°03'08.8"N
W4:120°08'04.8"E,24°03'07.4"N
(2) 水下基礎安裝工程範圍:
1:120°11'18.5"E,24°07'12.1"N
2:120°10'22.1"E,24°05'59.5"N
3:120°09'25.8"E,24°04'46.8"N
4:120°11'46.6"E,24°07'07.7"N
5:120°10'51.8"E,24°05'56.6"N
6:120°09'57.1"E,24°04'45.5"N
7:120°09'02.4"E,24°03'34.4"N
8:120°12'14.7"E,24°07'03.2"N
9:120°11'21.6"E,24°05'53.7"N
10:120°10'28.4"E,24°04'44.2"N
11:120°09'35.3"E,24°03'34.6"N
12:120°12'42.8"E,24°06'58.7"N
13:120°11'51.3"E,24°05'50.8"N
14:120°10'59.7"E,24°04'42.8"N
15:120°10'08.2"E,24°03'34.9"N
16:120°13'10.9"E,24°06'54.3"N
17:120°12'21.0"E,24°05'47.9"N
18:120°11'31.1"E,24°04'41.5"N
19:120°10'41.2"E,24°03'35.1"N
20:120°13'39.0"E,24°06'49.8"N
21:120°12'50.7"E,24°05'45.0"N
22:120°12'02.4"E,24°04'40.2"N
23:120°11'14.1"E,24°03'35.4"N
24:120°14'07.1"E,24°06'45.3"N
25:120°13'20.4"E,24°05'42.1"N
26:120°12'33.7"E,24°04'38.9"N
27:120°11'47.0"E,24°03'35.6"N
28:120°14'35.2"E,24°06'40.8"N
29:120°13'50.1"E,24°05'39.2"N
30:120°13'05.0"E,24°04'37.5"N
31:120°12'19.9"E,24°03'35.9"N
OSS1-SW:120°12'26.1"E,24°05'12.2"N
OSS1-SE:120°12'27.0"E,24°05'12.2"N
OSS1-NW:120°12'26.1"E,24°05'13.0"N
OSS1-NE:120°12'27.0"E,24°05'13.0"N
3.作業分包商:
寶崴海事工程股份有限公司
4.作業船舶:
(1) SFE Hercules
(2) SFE Developer
(3) SFE Pioneer
(4) DF Buffalo
(5) Forte
(6) CSBC 12
(7) CSBC 11
(8) Greatship Maya
(9) Orient 6
(10) EC639
(11) EC653
(12) TIPM13206
(13) Triton 9
(14) TIPM 514001
(15) Magellan II
(16) MP Pahlawan
5. 作業項目:水下基礎安裝工程作業
6. 目前辦理情形:持續調查中
交通部航港局礙航公告:
https://www.motcmpb.gov.tw/Information/Detail/ba261480-7958-45ca-93ea-73a0c84b18b1?SiteId=1&NodeId=483